Coming soonReady unitsShurfat Al-Hijaz

Shurfat Al-Hijaz - Al-Nuzhah

Al-Nuzhah District · Jeddah · Makkah Province

  • Unit typesReady units
  • Sales statusComing soon

Contact us for unit and price details

How far along?

Construction stages

From the first dig to the handover of keys. Follow the site stage by stage, as our team photographs it.

Current stage
Finishing
Last site visit
06/10/2026
Finishing
Stage 4 of 5 · 75%
Finishing
Taken 17/09/2026
01 / 09

Quality first

  • Saudi Building CodeEngineering specifications approved under the Saudi Building Code, for quality that lasts for years.
  • Waterproofing and thermal insulationCertified waterproofing for roofs, bathrooms and balconies, and complete thermal insulation for walls and ceilings.
  • Aluminium and glazing systemsAluminium windows with double glazing that insulates against sound and heat, for quiet and privacy.
  • Mechanical installationsElectrical installations and plumbing systems built to international codes and approved technical specifications.
  • Final finishesHigh-specification porcelain tiling in a contemporary design that combines good looks with durability.
  • Warranties and supervisionComprehensive insurance against hidden defects, and direct engineering supervision at every stage of construction.

The same specification on every project we build, not only on this one.

City
JeddahMakkah Province
District
Al-Nuzhah District
Project type
Ready units

Video

  • Aerial footage of the concrete works

    An aerial shot pulling back from the building frame and the concrete pump to the surrounding neighbourhood, 14 July 2026.

  • Aerial footage of the concrete pour

    A top-down view of the slab pour with the concrete pump and mixer trucks, 23 June 2026.

  • Aerial view of the site during the pour

    An oblique aerial shot of the slab and the concrete pump, rising to show the site within its neighbourhood, 23 June 2026.

Projects